• Engineering Excellence

Recent Works

We are dedicated to delivering top-notch engineering solutions tailored to meet the specific needs of each and every project.

Pipelines

So Many More Successful Projects to Come.... Check Back Soon!

Let's Connect

Have a project in mind?

We have a solution

Pipelines

8" Osum Pipeline

Alta Gas

Cold Lake, AB

Project Overview

13km  of 8″ pipeline, Three (3) major HDD’s totaling approx. 1800m, Six (6) brownfield riser sites, One (1) new OPP skid

Total installed cost

$9MM

Have a project in mind?

We have a solution

Oil & Gas Facilities

Townsend T2B Deep Cut and Propane Sulphur Treating Integration

Alta Gas

NE, BC

Project Overview

Integration of new 200MMSCFD Deep Cut Plant and Propane Sulphur Treating Unit into existing Townsend facility.  Includes all interconnecting piping piping and mods (124 Tie-ins), piping / electrical tie-ins between four (4) plants, generator addition and new power supply to Mercaptan treating and deep cut plants. Addition of five (5) 120,000 USG NGL Bullets and a single truck off-loading station.

Total installed cost

$165MM

Have a project in mind?

We have a solution

Pipelines | water Treatement

C-64 Water Injection
& Tie-In

Erikson
National Energy

July Lake, BC

Project Overview

Water from a frac pond was pumped through a temporary surface polyethylene pipeline to an existing battery and equipped with new water storage tanks. Facility equipment also included an MCC Building, a water injection pump skid, a generator and a 6” OD water injection pipeline to a nearby injection well.

Total installed cost

$2,100,000

Have a project in mind?

We have a solution

wells/Pads

Standard Wellpad Design

Hammerhead Resources

Grande Prairie, AB

Project Overview

Engineering Design and Layout of up to 24 well pad.

Total installed cost

$525K / well

Have a project in mind?

We have a solution

Wells/Pads

D56 Pad Site

Saguaro

NE, BC

Project Overview

Greenfield pad site design and initial installation of first 7 wells, including test separation, headers, fuel gas conditioning, and power generation.

Total installed cost

$2.5MM

Have a project in mind?

We have a solution

Kaybob Gas Plant

Celtic Exploration

Fox Creek, AB

Have a project in mind?

We have a solution

Energy Transition/Sustainability - Plastic Recycling

Plastics Pyrolysis Pilot Plant

Plascred

Calgary, AB

Project Overview

Engineered pilot process and designed plastics pyrolysis reactor.

Total installed cost

$950,000

Have a project in mind?

We have a solution

Pipelines

Carstairs 8" Sour Gas Pipeline - FEED

Alta Gas

Central AB

Project Overview

Feed for 30Km 8″ Sour Natural Gas Pipeline c/w 5 mid-point risers

Total installed cost

$150K

Have a project in mind?

We have a solution