Project Overview

This project included the design and construction of a spec. propane LACT that included the following:
– Two (2) 200 h.p. multi-stage centrifugal pumps
– Coriolis meter, chromatograph, PLC, Programming
– MCC, 4160 switch gear, 600 V transformer
– Civil, structural, piping, electrical, instrumentation and facility tie-ins