Client: Plains Midstream Canada
Project: Strathcona Shipping Terminal – 400,000 bbl storage capacity
Description: After the addition of 80,000 bbl storage it was decided to merge all the different construction phases into one consistent set of completely as built mechanical and electrical drawings. When drawings were returned p & ids existed as one set c/w new drawing numbers, connector arrows and consistent instrumentation. Piping, civil and electrical all existed as individual x-refs that could be referenced to any scalable drawing (including plot plans).