Compressor Stations

Taqa North Ltd. Lone Pine Creek

Project: Two Grass roots Multi-Well Gas Batteries and 100 Well Tie-in Program-10 MMSCFD & 5 MMSCFD

Client: Taqa North Ltd.

Location: Lone Pine Creek, Alberta

Description:Two Multi-Well Gas Battery installations including: mechanical, electrical, civil, structural and regulatory components.  The program also included 100 well tie-in and eight (8) field meter stations. The 87.5 Km gathering system was constructed of 5” and 8” high density polyethylene pipe (HDPE) and two (2) 6” steel sales gas pipelines (3Km and 6Km respectively).  Both locations where designed for future expansion and the batteries are comprised of the following equipment:

12-19 MWB

  • One (1) 60” ID x 18’ S/S horizontal inlet separator
  • Two (2) sales gas compressors – 1680 HP per unit
  • One (1) lube oil scrubber
  • One (1) 30” OD Dehydrator with still column vent tank
  • One (1) 42” OD x 8’ S/S H.P. vent knock-out drum c/w 6” OD x 40’ vent stack
  • One (1) 400 BBL heated water storage tank c/w secondary containment
  • A low mounted above ground pipe rack, pipeline pigging facilities, instrument air compressor and MCC building.

08-21 MWB

  • One (1) 60” ID x 18’ S/S horizontal inlet separator
  • Two (2) sales gas compressors – 1680 HP per unit
  • One (1) lube oil scrubber
  • One (1) 24” OD Dehydrator with still column vent tank
  • One (1) 42” OD x 8’ S/S H.P. vent knock-out drum c/w 6” OD x 40’ vent stack
  • One (1) 400 BBL heated water storage tank c/w secondary containment
  • A low mounted above ground pipe rack, pipeline pigging facilities, instrument air compressor and MCC building.

Total Install Cost: $21, 700, 000.00

Engineering Cost: $1, 500, 000.00

Direct Energy Trust Compressor Station

Project: Direct Energy Trust Compressor Station

Client: Direct Energy Trust

Location: Jarvie, Channel Lake, Burstall, and Hilda, Alberta

Description:

Grey owl was responsible for Installation of several Compressor station ranging from 1200 to 1500 HP Reciprocating units in Jarvie, Channel Lake, Burstall and Hilda areas, Gas Plant expansion which included Inlet separator, Dehydration and Choke plant, Pipeline, Sweet /Sour well tie-ns, Upgrades of Elec./ Inst. system and ERCB, ABSA regulatory compliance to execute projects.

Total Capital Cost: $35,000,000.00

Engineering Cost: $700,000.00

EnCana Gas Facilities

Project: Encana Gas Facilities

Client: EnCana Oil & Gas

Location: Carrot Creek, Alberta & Leland, Alberta

Description:

Carrot Creek Facility

  • Approximately 20 sweet and sour dual completion wells and sweetening facilities
  • 40 MMSCFD Plant Upgrade and Compressor Addition

Leland Facility

  • Grassroots 50MMSCFD flow split and compressor facility; Phases 1 and 2

Total Capital Cost: $30, 000,000.00

Engineering Cost: $3,000, 000.00