Compressor Stations
Taqa North Ltd. Lone Pine Creek
Project: Two Grass roots Multi-Well Gas Batteries and 100 Well Tie-in Program-10 MMSCFD & 5 MMSCFD
Client: Taqa North Ltd.
Location: Lone Pine Creek, Alberta
Description:Two Multi-Well Gas Battery installations including: mechanical, electrical, civil, structural and regulatory components. The program also included 100 well tie-in and eight (8) field meter stations. The 87.5 Km gathering system was constructed of 5” and 8” high density polyethylene pipe (HDPE) and two (2) 6” steel sales gas pipelines (3Km and 6Km respectively). Both locations where designed for future expansion and the batteries are comprised of the following equipment:
12-19 MWB
- One (1) 60” ID x 18’ S/S horizontal inlet separator
- Two (2) sales gas compressors – 1680 HP per unit
- One (1) lube oil scrubber
- One (1) 30” OD Dehydrator with still column vent tank
- One (1) 42” OD x 8’ S/S H.P. vent knock-out drum c/w 6” OD x 40’ vent stack
- One (1) 400 BBL heated water storage tank c/w secondary containment
- A low mounted above ground pipe rack, pipeline pigging facilities, instrument air compressor and MCC building.
08-21 MWB
- One (1) 60” ID x 18’ S/S horizontal inlet separator
- Two (2) sales gas compressors – 1680 HP per unit
- One (1) lube oil scrubber
- One (1) 24” OD Dehydrator with still column vent tank
- One (1) 42” OD x 8’ S/S H.P. vent knock-out drum c/w 6” OD x 40’ vent stack
- One (1) 400 BBL heated water storage tank c/w secondary containment
- A low mounted above ground pipe rack, pipeline pigging facilities, instrument air compressor and MCC building.
Total Install Cost: $21, 700, 000.00
Engineering Cost: $1, 500, 000.00
Direct Energy Trust Compressor Station
Project: Direct Energy Trust Compressor Station
Client: Direct Energy Trust
Location: Jarvie, Channel Lake, Burstall, and Hilda, Alberta
Description:
Grey owl was responsible for Installation of several Compressor station ranging from 1200 to 1500 HP Reciprocating units in Jarvie, Channel Lake, Burstall and Hilda areas, Gas Plant expansion which included Inlet separator, Dehydration and Choke plant, Pipeline, Sweet /Sour well tie-ns, Upgrades of Elec./ Inst. system and ERCB, ABSA regulatory compliance to execute projects.
Total Capital Cost: $35,000,000.00
Engineering Cost: $700,000.00
EnCana Gas Facilities
Project: Encana Gas Facilities
Client: EnCana Oil & Gas
Location: Carrot Creek, Alberta & Leland, Alberta
Description:
Carrot Creek Facility
- Approximately 20 sweet and sour dual completion wells and sweetening facilities
- 40 MMSCFD Plant Upgrade and Compressor Addition
Leland Facility
- Grassroots 50MMSCFD flow split and compressor facility; Phases 1 and 2
Total Capital Cost: $30, 000,000.00
Engineering Cost: $3,000, 000.00